Initial 25 kW Testing
The first 25 kW systems were tested on Shuswap by pulling the systems through the water with a tug boat. The systems were complete other than power conversion equipment. The drive train, mooring harness, and flotation platform were all tested. The generator was loaded with a resistor bank.